From emergency pull cords to handrails, the project was completed to meet all current safety regulations.
The Specification
To upgrade the current restroom and reconfigure to create a disabled restroom meeting current regulations.
This included:
- Removal of the existing fixtures and fittings including toilet, sink, floor and wall tiles. Our plumbers capped the water, Aspro electricians isolated any electrical items on walls to be removed.
- Removal and relocation of doorways, the previous door ways bricked up to allow reconfiguration.
- Installation of new wall across the toilet width.
- Installation of new toilet suite along with appropriate fixtures and fixings.
- Screeding and installation of floor vinyl.
- Plastering and decorating completed by our operatives along with all woodwork fitted by Aspro's experienced joiners.
- Re-configuration and installation of a small section of the ceiling grid.
- Our electricians completed installation of light fittings and panic alarm kit.
- To tidy up the opening beyond the door, a small section of floor tiling was installed to finish off the newly polished disabled toilet.



×